Customer Success Story
Integration into Existing Maintenance Software
The maintenance team of the Schaeffler production plant in Herzogenaurach was looking for an innovative lubrication and monitoring solution to prevent unnecessary production stops during maintenance of the multi-stage press. The final solution should optimize maintenance work, be sustainable and, above all, be integrated into the existing predictive maintenance system.
The OPTIME C1 smart lubricator meets all these requirements. With this digital solution, maintenance can keep machines running even in pandemic times thanks to location-independent access to machine data.
And the monetary benefit?
More than 137,000 euros saved for each prevented multi-stage press breakdown.
Benefits
Customer benefits
More time – regular inspections become unnecessary
Optimum integration into existing maintenance software thanks to API interface
Simple and plannable maintenance – status of all lubricators always in view from afar -thanks to plain text messages on mobile devices
Fewer production stops thanks to smart lubricator technology
More sustainability – OPTIME C1 saves up to 30 percent of lubricant
Challenge
Solution
With OPTIME C1, maintenance in Herzogenaurach has found the right solution.The innovative wireless lubrication and monitoring solution consists of the smart OPTIME C1 lubricator, a cartridge, a gateway, and a digital service component. An app visualizes the data on a mobile device. It displays the filling level of the lubricant cartridge and errors, such as lubrication line blocks. The relevant status and alarm messages are transmitted from the OPTIME C1 to the Schaeffler cloud as well as into the predictive maintenance system via API interface. The maintenance team can thus conveniently access the data anytime and anywhere.
What´s Special
The time savings and the advantage of disburdening and protecting the personnel fully convinced the maintenance management. For this reason, in addition to the multi-stage press other machines and machine components are to be equipped with the OPTIME C1 in order to completely avoid unplanned downtimes in the future.
Savings
The expenses for monitoring the fill levels of the lubrication solution used before are eliminated. Depending on the plant and the number of multi-stage presses, the savings can quickly become noticeable.
Costs for one multi-stage press failure: | |
Various mechanic labors for toggle repair | 104.300 € |
Material expenses | 33.054 € |
Results in savings of around | 137.000 € |